New Member
April 13, 2021
The uncut moldings are 4 meters long. The spreadsheet needs to automatically generate arrays populated with the lengths to cut from each 4 meter length of profile in order to minimize off cut wastage.
Each array representing 1 full 4 meter length.
Basically the spreadsheet needs to optimize the mix of lengths to cut from each 4 meter long picture frame molding. for example the 12 frames to be made are as follows: 4 frames 80 x 120 cm, 2 frames 65 x 95 cm, 2 frames 70 x 110, 2 frames 30 x 50 cm, 1 frame 105 x 160, 1 frame 25 x 65.
The spreadsheet also needs to indicate how many lengths of moldings will be required.
Thanks in advance for any suggestions.
Power Query
Power Pivot
Xtreme Pivot Tables
Excel for Decision Making
Excel for Finance
Excel Analysis Toolpak
Power BI
Excel
Word
Outlook
Excel Expert
Excel Customer Service
PowerPoint
November 8, 2013
Hi Franck,
Optimizing cuts is not an easy problem, cannot be solved with a simple formula.
See this video, it's cheaper to buy specialized software instead of wasting weeks to solve again a solved problem.
1 Guest(s)