Hi Team,
I have the attached visualisation developed with Matrix.
When I tried to add Budgeted hours for the fortnight as attached, it is in every columns and which is not the one we wanted(as in 2nd Visualisation). At the moment I did 2 visualisations and brought back one to get what I required as per 3rd visualisation.
Is there any proper way to get that.
Thank you.
regards,
Aye
Hi Aye,
I'm not aware of a way you can do that, sorry. Maybe create two matrix tables, one with actuals, one with a single budget column. Then align them with the actuals overlapping the budget table so the row labels on the left are hidden.
Mynda
Thanks, Mynda,
I did the way like you suggested. By doing so, I sometimes require to realign the column width.
Please refer me the chapter for fixing column wide if you can spare sometimes.
Thank you.
Regards,
Aye